Real transformations delivered on time and within agreed contract sums. Explore our detailed residential case studies across London and the Home Counties.

House Extension & Kitchen
📍 Harrow on the Hill, HA1
Victorian Semi-Detached 6m Rear Extension & Kitchen
The client required the demolition of a dated 1970s conservatory and the construction of a contemporary flat-roof extension with a 3m x 1.5m flush glass roof lantern. We installed a three-piece steel goalpost arrangement to knock through the original rear exterior wall, creating a seamless 42m² open-plan kitchen-living space with polished concrete flooring and bespoke German handleless cabinetry.
Duration:
14 Weeks
Planning:
Prior Approval
Sign-Off:
+42 m²
Duration:
Harrow Council
"The joinery on the custom staircase matches the 1900s originals perfectly." — Client: Sarah M.
Plan a Similar Build →
Full House Refurbishment
📍 Chiswick, London W4
Period Villa Back-to-Brick Refurbishment
A comprehensive, back-to-brick structural renovation of a 4-storey period residence. Works included full structural underpinning, installation of wet underfloor heating across three floors, complete Part P rewiring with smart Lutron lighting controls, acoustic insulation between joists, and bespoke sash window restorations.
Duration:
10 Weeks
Planning:
Permitted Dev
Added Space:
+38 m²
Sign-Off:
Approved Inspector
"Complete peace of mind knowing GN handled building control directly." — Client: James & Laura K.
Plan a Similar Build →
House Extension & Kitchen
📍 Harrow on the Hill, HA1
Victorian Semi-Detached 6m Rear Extension & Kitchen
The client required the demolition of a dated 1970s conservatory and the construction of a contemporary flat-roof extension with a 3m x 1.5m flush glass roof lantern. We installed a three-piece steel goalpost arrangement to knock through the original rear exterior wall, creating a seamless 42m² open-plan kitchen-living space with polished concrete flooring and bespoke German handleless cabinetry.
Duration:
10 Weeks
Planning:
Permitted Dev
Added Space:
+38 m²
Sign-Off:
Approved Inspector
"Delivered exactly to the agreed price schedule." — Client: Mr & Mrs Patel
Plan a Similar Build →